Skip to main content
Feb 12, 2025 — PPWR entered into forceAug 12, 2026 — PPWR general applicationAug 12, 2026 — Declaration of Conformity mandatoryFeb 12, 2027 — Harmonised methodologies adoptedAug 12, 2028 — Harmonised labelling mandatoryJan 1, 2029 — Deposit return systems operationalJan 1, 2030 — Below-Grade-C banJan 1, 2030 — Recycled content targetsJan 1, 2030 — Reuse targets bindJan 1, 2030 — Annex V format bansJan 1, 2030 — Waste prevention −5%Jan 1, 2038 — Only Grades A and B remainJan 1, 2040 — Final recycled-content stepJan 1, 2040 — Reuse targets step upJan 1, 2040 — Waste prevention −15%Feb 12, 2025 — PPWR entered into forceAug 12, 2026 — PPWR general applicationAug 12, 2026 — Declaration of Conformity mandatoryFeb 12, 2027 — Harmonised methodologies adoptedAug 12, 2028 — Harmonised labelling mandatoryJan 1, 2029 — Deposit return systems operationalJan 1, 2030 — Below-Grade-C banJan 1, 2030 — Recycled content targetsJan 1, 2030 — Reuse targets bindJan 1, 2030 — Annex V format bansJan 1, 2030 — Waste prevention −5%Jan 1, 2038 — Only Grades A and B remainJan 1, 2040 — Final recycled-content stepJan 1, 2040 — Reuse targets step upJan 1, 2040 — Waste prevention −15%
PPWR Connect
Vera

Loading…